Hangzhou great welfare technology co., ltd

Hangzhou great welfare technology co., ltd

Manufacturer from China
Verified Supplier
2 Years
Home / Products / EPS Production Line Related /

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

Contact Now
Hangzhou great welfare technology co., ltd
City:hangzhou
Province/State:zhejiang
Country/Region:china
Contact Person:MsYan
Contact Now

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

Ask Latest Price
Model NO. :HS-ZK-200
Automation :Automatic
Computerized :Computerized
Certification :ISO 9001
Delivery Time :Peak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Cycle Time :60-180s
Weight :6000kg
Control Method :Remote Control
Transport Package :Wooden Case
Specification :5000*2300*3500
Trademark :huasheng
Origin :China
HS Code :8477409000
Supply Ability :100PCS /Year
Package Size :5500.00cm * 2200.00cm * 3500.00cm
Package Gross Weight :12000.000kg
After-sales Service :Engineers Available to Service Machinery Overseas
Warranty :12 Months
Type :EPS Foam Machine
Customization :Available | Customized Request
Shipping Cost :about shipping cost and estimated delivery time.
  :Initial Payment Full Payment
Currency :US$
Return&refunds :You can apply for a refund up to 30 days after receipt of the products.
Place of Origin :China
MOQ :1 Set
Packaging Details :Wooden Case
Payment Terms :LC, T/T
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
central vacuum system for eps shape molding machine
Product Description

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

central vacuum system for eps shape molding machine Main features:

  • The central vacuum system consists of vacuum tank, drainage tank, high efficiency vacuum pump, electric control device, pipeline valve, electrical instrument, base, etc.
  • The electric control device controls the suction quantity and the running time of each vacuum pump, and reaches the set value and is in the standby state;
  • Running data can be set on the touch screen;
  • each pump can be controlled automatically and manually, and the vacuum system can be closed automatically when the power is cut off;
central vacuum system for eps shape molding machine data:
Item Unit HS-ZK-200 HS-ZK-300 HS-ZK-400
Sucking rate M3/h 580 870 1160
Installing power Kw 7.5*2 7.5*3 7.5*4
Shape Machine QTY Sets 6 10 15
Flow chart
Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time
Detailed Photos

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery TimeCentral Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery TimeCentral Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

Company Profile

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time
Zhejiang Huasheng Machinery Equipment Co., Ltd, located in Fuyang, Hangzhou City, China, is a manufacturer
for high-end EPS foam machinery and EPS moulds.


Huasheng has developed into a modern and standardized production base with an area of over 18, 000 square meters,
more than 100 employees and a team of highly qualified and educated researchers, and obtained 15 invention patents.


The main products include high-precision automatic pre-expander machine, fully automatic shape molding machine ,
EPS block moulding machine, EPS foam mold, EPS lost foam white area equipment etc.


We warmly welcome all customers and friends from both domestic and abroad.

Company show

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

Certifications

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

Packaging & Shipping

Central Vacuum System for EPS Foam Machine Shipping Cost and Estimated Delivery Time

FAQ

Q: Are you a factory or trading company?
A: We are a factory of EPS machine and EPS mold.

Q: what is your payment term?
A: 30% down payment upon order confirmation, 70% balance payment before shipment.

Q:what is your delivery time?
A: It takes usually 45-60days for machines, and 25-30days for EPS mold.

Q: Do you send engineer to our local place to instruct installation?
A:Yes,if you need,we will arrange engineer for you,and we can provide turn-key job.

Q: Warranty?
A: One year warranty after installation is completed.During warranty period, for broken parts not by man-made and wear parts, factory seller will replace free of charge. the shipping cost will be borne by buyer, seller will equip standard spare wear parts to buyer.



























Inquiry Cart 0